The base of the tower has 4 screw jack assemblies with 6" diameter foot pads which are adjustable to enable leveling of the tower. The base also incorporates 4 ball castors which allows the whole rig to be accurately positioned before the toweris raised. Once the tower system is ready to be raised, all the screw jacks must beadjusted evenly and must take the load off the ball castors.